loading

Turnkey Cleanroom Solutions And Hvac System Service Provider

Guangdong Meizhou Stem Cell Laboratory

×
Guangdong Meizhou Stem Cell Laboratory

Location: Meizhou, Guangdong

Project Name: Stem Cell Laboratory Installation

Cleanliness Class: Class 10,000

Wall Structure: Glass-magnesium cleanroom panels

HVAC & Cleanroom Equipment: Central cleanroom air conditioning, purified water system, pass-through boxes

Piping: Stainless steel purified water system, drainage system, ductwork

Instruments: Temperature and humidity monitors, differential pressure gauges, airflow control valves

Electrical: Power distribution boxes, cleanroom lighting fixtures, switches/sockets, UV lamps

Flooring: Wear-resistant PVC flooring

Doors & Windows: Prefabricated steel doors and double-glazed observation windows; frames made of high-quality electrophoretic profiles.


The Class 10,000 laboratory maintains room pressure differentials by balancing supply and return airflow; supply air enters the room after passing through primary, medium, and high-efficiency (HEPA) filters. The enclosure and ceiling utilize 50mm-thick specialized cleanroom panels, offering high mechanical strength, excellent thermal insulation and moisture resistance, a smooth flat finish, corrosion resistance, ease of cleaning, and simple installation. Transitions at wall corners (internal and external), as well as junctions between walls and floors/ceilings, feature coved (radiused) profiles and are fully sealed; all supporting aluminum alloy components utilize high-quality electrophoretic profiles.

Laboratory Lighting: Specialized laboratory fixtures are used; they are sealed, flush-mounted, aesthetically pleasing, dust-resistant, and easy to clean. For energy efficiency, the system is designed as a mixed fresh air and return air system, utilizing a top-supply/bottom-side-return airflow pattern. The Class 10,000 sterile cell laboratory employs an air-cooled, direct-expansion (DX) cleanroom-specific ducted air conditioning unit to meet heating and cooling loads across seasons and maintain constant temperature and humidity. Motorized airtight valves are installed on fresh air ducts to prevent backflow when the system is shut down and to allow for airtight sealing during disinfection.


Design Basis: "General Requirements for Laboratory Biosafety," "Technical Specifications for Biosafety Laboratory Construction," "Code for Design of Cleanrooms," "Code for Construction and Acceptance of Ventilation and Air Conditioning Engineering," "Code for Construction and Acceptance of Cleanrooms," "Code for Design of Heating, Ventilation and Air Conditioning," "Code for Design of Low-voltage Electrical Distribution Equipment and Lines," etc.

prev
Medical Device Injection Molding Cleanroom – Penang
Stem Cell Center Laboratory Case Project in Michigan
next
recommended for you
Get in touch with us
Ready to work with us ?
Contact Us
Copyright © 2026 Shenzhen Aircolourful Environment Technology Co., Ltd  | Sitemap  | Privacy Policy
Contact us
whatsapp
Contact customer service
Contact us
whatsapp
cancel
Customer service
detect