Main Construction Scope:
1. Corrugated steel plate partition walls and ceiling installation
2. Pure water unit and pure water pipeline installation
3. Air-cooled modular chiller unit, constant temperature and humidity combined air handling unit system
4. Chilled water system
5. Pass-through window, high-efficiency air outlet, and differential pressure gauge installation
6. Epoxy resin self-leveling flooring
7. Lighting, power, electrical, monitoring, and low-voltage system installation
8. Water supply, drainage, and sewage treatment equipment installation
9. Stainless steel products and laboratory furniture installation