Main Construction Scope:
1. Magnesium oxide board partition walls and ceiling installation
2. Steel prefabricated doors and double-glazed windows installation
3. Air-cooled modular chiller units and constant temperature and humidity combined air handling unit system
4. Chilled water system
5. All-stainless steel self-cleaning pass-through windows and high-efficiency air outlets with DOP detection liquid tank installation
6. PVC roll flooring
7. Lighting, power, electrical, monitoring, and low-voltage system installation
8. Water supply and drainage system installation, purified water unit installation
9. Stainless steel products and laboratory furniture installation